Invoicing for contractors follows the life of the job. You bill a deposit when the contract is signed and progress bills as stages are completed, with each approved change order on its own line, then a final invoice at completion. On many commercial jobs a percentage of each progress bill is held back as retainage and released at the end. Agree all of it in the contract before work starts.
A construction invoice is a contractor's request for payment for work on a building project. Unlike a one-off service invoice, it is usually one of a series issued against a single contract, each showing how the current amount relates to the contract value and to what has already been paid or withheld, so that the series adds up to the contract total.
The contractor billing lifecycle
Most construction jobs, residential or commercial, pass through the same billing stages:
- Contract: the price and how it will be billed are agreed in writing, including any retainage.
- Deposit or mobilization: an up-front payment before work starts.
- Progress bills: invoices at milestones or at regular intervals for work completed.
- Change orders: priced, signed additions or deductions to the scope, billed as they are completed.
- Final invoice: the remaining contract balance at completion, once any punch list is done.
- Retainage release: the amounts withheld along the way, paid once the contract's conditions are met.
Each stage depends on the one before. A billing schedule that isn't in the contract is hard to enforce at stage three, and a change order that wasn't signed is hard to collect at stage five.
A worked example: a $240,000 build-out
Follow one hypothetical job. A general contractor signs a $240,000 contract to build out a commercial tenant space. The contract allows a 10% deposit, three progress bills at defined milestones, and 10% retainage on each progress bill (not on the deposit), to be released after substantial completion. Those terms are illustrations; yours will come from your own contract.
| Bill | Milestone | Share | Billed | Retainage held | Due now |
|---|---|---|---|---|---|
| Deposit | Contract signed | 10% | $24,000 | $0 | $24,000 |
| Progress 1 | Demolition and framing complete | 30% | $72,000 | $7,200 | $64,800 |
| Progress 2 | Rough-ins and drywall complete | 35% | $84,000 | $8,400 | $75,600 |
| Progress 3 | Finishes complete | 25% | $60,000 | $6,000 | $54,000 |
| Total | 100% | $240,000 | $21,600 | $218,400 |
The contractor has received $218,400 when the last progress bill is paid, and $21,600 is still owed as retainage ($218,400 + $21,600 = $240,000). That $21,600 is earned money that won't arrive until the closeout conditions are met, which can be weeks or months later. Plan for it in your cash flow, because the costs of finishing the job arrive well before it does.
Deposits: what they're for
A deposit pays for the commitment before the work, such as materials orders and the crew time you've reserved. On residential jobs it also confirms the customer is serious. Invoice it on signing and don't order materials until it's paid. Home improvement contracts are regulated at the state level, and some states limit the size of the up-front payment a contractor can take, so check your state's rules before setting a percentage. Our guide to deposit invoices shows how the deposit should appear as a credit on later bills.
Progress bills
Each progress invoice should show the whole picture, not only the current amount. Set it out in this order:
- Original contract sum.
- Approved change orders to date.
- Revised contract sum.
- Work completed to date.
- Retainage held.
- Previous payments.
- Amount now due.
A customer, or their lender, can then see at a glance that the bill is consistent with everything before it.
Progress bills can be tied to milestones, as in the example, or issued monthly based on percentage complete. Milestones are simpler to verify; percentage-complete billing suits long jobs where milestones are far apart. Our guide to progress billing works through both methods and the schedule of values that percentage billing relies on.
How to bill change orders
Change orders are where contractor invoicing most often breaks down. The work gets done on a verbal okay, the price is settled afterwards, and the customer remembers the conversation differently. Four rules prevent most of it:
- Price it before you build it. Write up the change, with its price and any effect on the schedule, before the work starts.
- Get it signed. A signed change order, by the person with authority to approve it, is what you'll be relying on if payment is questioned.
- Number it. CO-001, CO-002 and so on, so each one is easy to reference on invoices and in correspondence.
- Bill it as its own line. Show each change order separately on the progress bill, so the original contract amounts stay intact and traceable.
In the example, suppose the tenant adds two glass office fronts during framing, approved as CO-003 for $11,400. The revised contract sum becomes $251,400 ($240,000 + $11,400). If the change is completed in the finishes stage and the contract applies retainage to change orders too, Progress 3 becomes:
- Base milestone: $60,000, plus CO-003: $11,400, for $71,400 billed.
- Retainage at 10%: $7,140.
- Due now: $71,400 − $7,140 = $64,260.
Total retainage held rises to $22,740 ($7,200 + $8,400 + $7,140). Deductive change orders, where scope is removed, work the same way in reverse and should be documented just as carefully.
Retainage basics
Retainage (also called retention) is a percentage of each progress payment the customer withholds until the project is complete, as security that the contractor will finish the work and fix defects. Its rate and the conditions for its release are set by the contract and, on some projects, by state law, which can limit the percentage or set deadlines for paying it out.
For a contractor, retainage means two things in practice. Track it as its own receivable, because it is easy to forget money you won't see for months. And invoice for its release as soon as the contract's conditions are met, with whatever documents the contract requires, rather than waiting for the customer to offer it.
The final invoice and closeout
The final invoice bills the remaining contract balance, plus any change orders not yet billed. It should go out as soon as the work is complete, but the money often depends on closeout paperwork, so assemble it alongside:
- Completion of the punch list, signed off by the customer.
- Lien waivers, usually conditional on payment, for you and, where required, your subcontractors and suppliers.
- Any warranties and as-built drawings the contract calls for.
- Any final inspection or certificate of occupancy that the release of payment depends on.
Lien rights and their notice deadlines are set by state law and vary considerably. They are among the strongest protections a contractor has for getting paid, and they can be lost by missing a deadline early in the job. Ask a construction attorney in your state which notices you need to send and when.
Residential and commercial billing compared
| Residential | Commercial | |
|---|---|---|
| Who pays | Homeowner, sometimes through a lender | Owner, developer or general contractor, through AP |
| Typical schedule | Deposit, one or two progress payments, final | Monthly or milestone progress bills with a schedule of values |
| Retainage | Less common | Common |
| Paperwork | Contract, change orders, receipts | Pay applications, lien waivers, insurance certificates |
| Payment methods | Card, bank payment, check | ACH, check, sometimes wire |
On either side, give customers an electronic bank payment option for large bills. A progress payment of $75,600 is a lot to charge to a card, and a check takes time to arrive and to clear. Our guide to accepting ACH payments covers the setup.
What to look for in invoicing software for contractors
Contractor invoicing software has to handle the whole series of bills on a job. Check that it can:
- Hold a contract value and a billing schedule, and generate each progress bill from them.
- Track retainage held and released as its own balance.
- Record change orders with their signatures and roll them into the next bill.
- Accept partial payments against an invoice, since customers on large jobs sometimes pay in parts.
- Take payment by bank transfer as well as card, from a link on the invoice.